PSA nitrogen · Made in India for Bahrain
PSA nitrogen generator supplier for Manama, Hidd and Bahrain
Gastek has built gas generation plants in India since 1993. Its PSA nitrogen generators reach Bahraini sites through Khalifa Bin Salman Port, at 95–99.999% purity and up to 5,000 Nm³/hr, with export documents and commissioning support.
- Ambient
- Design ambient set per site
- Intake air
- Heat, dust and sand: inlet filtration and compressor cooling sized for the site
- Humidity
- Humid air around Hidd and Sitra: dryer duty and condensate drains sized to suit
- Installation
- Skid in a ventilated utility room, a shaded skid, or a container-ready layout
- Ports
- Khalifa Bin Salman Port
- Documents
- Invoice, packing list, certificate of origin, bill of lading, datasheets
- Electrical
- Electrical requirements are reviewed during sizing and quotation.
How a nitrogen plant travels from India to a Bahraini site
Road · sea · road
Greater Noida works
Engineering, assembly, testing and export packing.
By road
Mundra or Nhava Sheva
Export clearance and loading at a west-coast port.
Sea freight
Khalifa Bin Salman Port
Import clearance by the consignee or their agent, then road delivery to Sitra, Salman Industrial City or your site.
By road
Your site
Placement, hook-up and commissioning with Gastek's engineers, on site or remotely.
Exported
Nitrogen plants Gastek has exported
The plants nearest a Bahraini buyer's question. More plants Gastek has supplied are on the Projects page.
610Nm³/hr
Refinery project, Malta
CE-certified nitrogen package
1,100Nm³/hr
Polyester chip makers
PSA nitrogen plants in Egypt, Turkey and Thailand
15+
Export markets
Plants shipped from the Greater Noida works
Since 1993D-U-N-S 91-686-7372ISO 9001:2015
All plants Gastek has suppliedSite conditions
Bahrain site conditions a nitrogen plant is sized for
Heat, dust and humid air on the coast around Hidd and Sitra change the air side of a PSA plant more than the adsorbers. The numbers mark where.
Regions
Ports and industrial areas Gastek ships to in Bahrain
Each project is planned around the port route and the site's industrial city or area.
| Region | Port | Industrial areas | Typical nitrogen demand |
|---|---|---|---|
| Hidd and Khalifa Bin Salman Port | Khalifa Bin Salman Port | Hidd, Bahrain International Investment Park |
|
| Alba-linked downstream cluster | Route set per site | Alba area, downstream aluminium zone, metal-processing sites |
|
| Sitra and refining corridor | Route set per site | Sitra, refinery-linked sites, tank farms, industrial utilities |
|
| Manama and industrial estates | Route set per site | Manama, Salman Industrial City, workshop and manufacturing routes |
|
Applications
Nitrogen generators for Bahraini industries
Flow, purity, compressor scope, dew point, outlet pressure and operating hours are matched to the process, not the industry label.
Aluminium and metal processing
Downstream aluminium, fabrication, heat-treatment support, protective atmospheres, packaging and utility use.
Aluminium and metal nitrogenPetrochemical and refinery
Reactors, storage tanks, catalyst handling, refinery operations, polymers, methanol and ammonia units, and process inerting.
Petrochemical and refinery nitrogenChemical processing
Tank blanketing, reactor inerting, solvent handling, oilfield chemicals, water-treatment chemicals, resins and polymers.
Chemical processing nitrogenFood and beverage
Modified atmosphere packaging, dry goods, edible oils, beverages and shelf-life protection.
Food and beverage nitrogenPharma and healthcare
API handling, packaging, storage blanketing, vial purging and oxygen- or moisture-sensitive processes.
Pharma nitrogenCMS replacement
CarboTech CMS for PSA nitrogen plants in Bahrain where purity has dropped, flow is unstable or a changeout is due.
CarboTech CMS
Enquiry to start-up
From enquiry to start-up at a Bahraini site
Built for plant, procurement and project teams who need a clear supplier quotation before approval or a purchase order.
01
Requirement review
Flow, purity, outlet pressure, application, operating hours, the Bahraini site location, utilities and site constraints are checked before sizing.
02
Engineering and quotation
The PSA package, compressor and air treatment, tanks, analyser, CMS, controls, layout and commercial scope are defined.
03
Manufacture and testing
Built at the Greater Noida works, assembled, tested and prepared for inspection and export packing.
04
Export documents
Commercial invoice, packing list, certificate of origin, bill of lading support, datasheets and drawings.
05
Shipping to Bahrain
Sea freight to Khalifa Bin Salman Port, with road delivery chosen by site and consignee.
06
Start-up
Commissioning, operator guidance, analyser verification, maintenance planning and spares, timed to site readiness.
Bahrain buyer questions
Bahrain nitrogen generator questions
Can Gastek supply a PSA nitrogen generator to Bahrain?
Yes. Gastek manufactures PSA nitrogen generators in India and supports Bahraini buyers with sizing, the quotation, export documents, shipping, commissioning and spares.
Which Bahraini locations does Gastek serve?
Sea freight can be planned to Khalifa Bin Salman Port. Sites include Manama, Hidd, Sitra, Salman Industrial City and Alba-linked downstream sites, with the delivery route set per site.
What does a nitrogen generator cost in Bahrain?
The price follows the duty: flow, purity, delivery pressure, and whether the compressor and dryer are part of the supply. For a Bahraini project it also depends on the delivery terms, ex-works, FOB or delivered to Khalifa Bin Salman Port, and on the import duty and VAT paid in Bahrain. Send the duty and Gastek quotes a configured plant with its running cost and payback against cylinders.
How long does it take from order to start-up?
Manufacture and testing come first, then sea freight, then clearance, installation and commissioning. Gastek confirms the schedule with the quotation, because it depends on the size and scope of the plant.
Is the plant suitable for Bahraini power and heat?
Yes, when it is sized for the site. Electrical supply, ambient temperature, compressor cooling, dryer duty, ventilation and operating hours are reviewed during sizing and quotation.
What information is needed for a quotation?
Nitrogen flow, purity or residual oxygen, outlet pressure, application, operating hours, the Bahraini site location, utilities, installation type and any document requirements.
Can Gastek replace the CMS in an existing Bahraini nitrogen plant?
Yes. With the vessel size, the CMS grade in use, flow, purity, pressure and the symptoms you see, Gastek can quote CarboTech CMS and plan the changeout.
Bahrain quotation
Send the Bahraini requirement. Gastek sizes the plant around it.
Flow, purity, pressure, operating hours, application and the Bahraini site location are enough to start. Gastek replies with a configured plant and the shipping route.
Gastek contact hoursMon–Sat, 9:00 am–6:00 pm IST
- Flow rate
- Purity or O₂ ppm
- Outlet pressure
- Application
- Region and site