PSA nitrogen · Made in India for the UAE
PSA nitrogen generator supplier for Dubai, Abu Dhabi and the UAE
Gastek has built gas generation plants in India since 1993. Its PSA nitrogen generators reach UAE sites through Jebel Ali and Khalifa Port, at 95–99.999% purity and up to 5,000 Nm³/hr, with export documents and commissioning support.
- Ambient
- Design ambient set per site
- Intake air
- Dust and sand: inlet filtration and compressor cooling sized for it
- Humidity
- Humid coastal air: dryer duty and condensate drains sized to suit
- Installation
- Skid in a utility room, a shaded skid, or a container-ready layout
- Ports
- Jebel Ali, Khalifa Port, Sharjah, Fujairah
- Documents
- Invoice, packing list, certificate of origin, bill of lading, datasheets
- Electrical
- Electrical requirements are reviewed during sizing and quotation.
How a nitrogen plant travels from India to a UAE site
Road · sea · road
Greater Noida works
Engineering, assembly, testing and export packing.
By road
Mundra or Nhava Sheva
Export clearance and loading at a west-coast port.
About a week at sea
Jebel Ali or Khalifa Port
Import clearance by the consignee or their agent; Sharjah and Fujairah also possible.
By road
Your site
Placement, hook-up and commissioning with Gastek's engineers, on site or remotely.
Exported
Nitrogen plants Gastek has exported
The plants nearest a UAE buyer's question. More plants Gastek has supplied are on the Projects page.
610Nm³/hr
Refinery project, Malta
CE-certified nitrogen package
1,100Nm³/hr
Polyester chip makers
PSA nitrogen plants in Egypt, Turkey and Thailand
15+
Export markets
Plants shipped from the Greater Noida works
Since 1993D-U-N-S 91-686-7372ISO 9001:2015
All plants Gastek has suppliedSite conditions
UAE site conditions a nitrogen plant is sized for
Heat, dust and humid coastal air change the air side of a PSA plant more than the adsorbers. The numbers mark where.
Emirates
Ports and free zones Gastek ships to in the UAE
Each project is planned around the nearest port and the site's free zone or industrial area.
| Emirate | Port | Free zones and industrial areas | Typical nitrogen demand |
|---|---|---|---|
| Dubai and Jebel Ali | Jebel Ali Port | JAFZA, Dubai Industrial City |
|
| Abu Dhabi | Khalifa Port | KIZAD, ICAD, Mussafah |
|
| Sharjah and Ajman | Sharjah ports | Hamriyah Free Zone, Ajman industrial areas |
|
| Northern Emirates | Fujairah | Ras Al Khaimah, Umm Al Quwain, Fujairah |
|
Applications
Nitrogen generators for UAE industries
Flow, purity, compressor scope, dew point, outlet pressure and operating hours are matched to the process, not the industry label.
Oil and gas
Pipeline purging, tank blanketing, pressure-testing support, inerting and process safety.
Oil and gas nitrogenFood and beverage
Modified atmosphere packaging, edible oils, beverages, dates, dry foods and shelf-life protection.
Food and beverage nitrogenPharma
API handling, packaging, storage blanketing, vial purging and oxygen- or moisture-sensitive processes.
Pharma nitrogenMetal and laser cutting
High-flow nitrogen for laser cutting, fabrication, brazing and heat-treatment support.
Metal and laser cutting nitrogenElectronics
SMT, soldering, electronic assembly and oxygen-sensitive production.
Electronics nitrogenCMS replacement
CarboTech CMS for PSA nitrogen plants in the UAE where purity has dropped or a changeout is due.
CMS in the UAE
Enquiry to start-up
From enquiry to start-up at a UAE site
Built for plant, procurement and project teams who need a clear supplier quotation before approval or a purchase order.
01
Requirement review
Flow, purity, outlet pressure, application, operating hours, emirate, utilities and site constraints are checked before sizing.
02
Engineering and quotation
The PSA package, compressor and air treatment, tanks, analyser, CMS, controls, layout and commercial scope are defined.
03
Manufacture and testing
Built at the Greater Noida works, assembled, tested and prepared for inspection and export packing.
04
Export documents
Commercial invoice, packing list, certificate of origin, bill of lading support, datasheets and drawings.
05
Shipping to the UAE
Sea freight to Jebel Ali, Khalifa Port, Sharjah or Fujairah, chosen by site and consignee.
06
Start-up
Commissioning, operator guidance, analyser verification, maintenance planning and spares, timed to site readiness.
UAE buyer questions
UAE nitrogen generator questions
Can Gastek supply a PSA nitrogen generator to the UAE?
Yes. Gastek manufactures PSA nitrogen generators in India and supports UAE buyers with sizing, the quotation, export documents, shipping, commissioning and spares.
Which ports and emirates does Gastek ship to?
Plants ship to Jebel Ali for Dubai and the northern free zones, to Khalifa Port for Abu Dhabi, KIZAD and ICAD, and to Sharjah or Fujairah where the site is closer. Sites in every emirate can be served.
What does a nitrogen generator cost in the UAE?
The price follows the duty: flow, purity, delivery pressure, and whether the compressor and dryer are part of the supply. For a UAE project it also depends on the delivery terms, ex-works, FOB or delivered to Jebel Ali, and on the import duty and VAT paid at the UAE end. Send the duty and Gastek quotes a configured plant with its running cost and payback against cylinders.
How long does it take from order to start-up?
Manufacture and testing come first, then about a week at sea, then clearance, installation and commissioning. Gastek confirms the schedule with the quotation, because it depends on the size and scope of the plant.
Is the plant suitable for UAE power and heat?
Yes, when it is sized for the site. Electrical supply, ambient temperature, compressor cooling, dryer duty, ventilation and operating hours are reviewed during sizing and quotation.
What information is needed for a quotation?
Nitrogen flow, purity or residual oxygen, outlet pressure, application, operating hours, the emirate and site, utilities, installation type and any document requirements.
Can Gastek replace the CMS in an existing UAE nitrogen plant?
Yes. With the vessel size, the CMS grade in use, flow, purity, pressure and the symptoms you see, Gastek can quote CarboTech CMS and plan the changeout.
UAE quotation
Send the UAE requirement. Gastek sizes the plant around it.
Flow, purity, pressure, operating hours, application and the emirate are enough to start. Gastek replies with a configured plant and the shipping route.
Gastek contact hoursMon–Sat, 9:00 am–6:00 pm IST
- Flow rate
- Purity or O₂ ppm
- Outlet pressure
- Application
- Emirate and site